Tarkett Flooring Installation Instructions
Vinyl composition tile flooring.
Tarkett flooring installation instructions. Check the rules in your country. Tarkett flooring may be installed over radiant heated floors provided the operating temperature does not exceed 85º f 29 4ºc. Room temperature must be maintained between 65 ー workmanship is employed in the and 85 ーf 18 ー and 30 ーc with hvac system operating. Tarkett will not accept responsibility for claims on flooring installed with obvious defects.
For installation room temperature should always be above 15 c or 18 c for linoleum. If the heating pipes are too close to the flooring the flooring may discolor next to the pipe work. Place 1 4 6 3mm spacers between the short and long side of the planks and the wall use 1 2 12 7mm spacers for. The end joints of the planks in the first row.
To get started you need to do the following. However there are a few exceptions. Do not fasten them through the laminate flooring. Those temperatures could be different.
The tongue side of the plank. Remove your vinyl floor from its packaging and keep it in the room where it is to be. Subtract 1 4 6 3mm or 1 2 12 7mm depending on the size of the spacer used from this measurement to allow for the spacer. Before installation sheets and tiles should relax minimum 24h out of packaging.
Installation begin laying planks from the left side of the starting wall and work to the right side. Pvc or. Ensure the subfloor is dry clean and flat. Tarkett flooring and adhesives must be site conditioned at room temperature for a minimum of 48 hours prior to during and after installation.
Rubber tile flooring installation instructions introduction these instructions are written as a guide to be used by professional installers when installing tarkett products. With the new 2 lock angle locking system parquet and laminate flooring have become very easy to install with only a few tools required. Do not install damaged planks. During installation inspect the groove area and remove any debris that may prevent proper assembly of planks.
Released may 2013 page 1 of 2 expressions vct inst 050713. In most cases you need to remove the existing floor covering. If this measurement is less than 12 20 3cm the length of first plank in the row must be cut. Saw pencil tape measure vacuum cleaner step 1 prepare your subfloor to ensure a smooth installation it is important to prepare the surface.
These instructions combined with our adhesives and flooring products create a system. Do not use a hammer and tapping block to install planks. Heating pipes shall be at least 2 inches 50 8mm below the surface of the concrete. Tarkett laminate8 installation instructions 2 locktarkett laminate9 installation instructions 2 lock finish remove the spacers from the perimeter of the room.